Isol-ECO
Budget : | 1,6 M € |
Duration : | 36 months |
Participants : | 4 partners in 3 States |
ETRA contact : | Dott. Ettore Musacchi |
The project represent a technical viable solution to start sending to material recycling 120,000 – 150,000 t of tyre textile per year in the EU, instead of incineration or landfill.
The objective of the project are:
- Design and establishment of an industrial scale production line in order to be able to produce 1.500m2/day of insulating panels.
- Optimisation of the product geometry, that is to develop a range of products build upon the inherent characteristics and properties of the INSUL-ECO panels.
- Elaboration of a Marketing Plan as well as a Business Plan.
- Improvement of the environmental performance and better use of natural resources.